Overview
Client W.RE
Role Project Management and Contract Administrator
Summary Comprehensive building refurbishment including replacement facade to Borough High Street.
Address 160-166 Borough High Street, London SE1
Value £3 million (16,000sq.ft)
Duration 47 weeks
Procurement/Tender Negotiated Traditional with Contractors Design
Team Cowie Montgomery - Architect
Akera Engineers - Structurual Engineer
Flatt Consulting - Building Services Engineer
Exigere - Quantity Surveyor
Orsa Projects - Principal Designer
Turley Associates - Planning Consultant
MLM - Approved Inspector
Collins Construction - Main Contractor
Three Key Issues
The front elevation of the existing building contained asbestos which redirected scheme design and challenged budgets
Net area gain by cantilevering the front facade to achieve value increase obtained by successful planning approach assisted overall development value
Selection of a high quality but minimalistic specification to suit the area in competition with other office space coming to the market has generated a design maximising floor to ceiling heights of a 1950's building